Pre-Warmed, Underused: The Black Friday Cloud Reserve and Its Grid Bill
US retailers pre-build and hold cloud capacity for the 2026 holiday peak, but much of that reserve is powered, cooled, and metered while waiting for traffic that may never arrive. The grid cost is small in aggregate and material at the local substation.